Projects

1
1

Liceo Mixto Los Andes

Plant of 130 kWp installed power via Sloped rooftops and on the roof with structures. Electricity generated annually: 233 MWh Installed panels: 400 CO2 reduced:

LEER MÁS »

Liceo Mixto San Felipe

Plant of 130 kWp installed power via Sloped rooftops and on the roof with structures. Electricity generated annually: 284 MWh Installed panels: 198 CO2 reduced:

LEER MÁS »

Colegio Ayelén

Plant of 130 kWp installed power via Sloped rooftops and on the roof with structures. Electricity generated annually: 195 MWh Installed panels: 400 CO2 reduced:

LEER MÁS »

GVP Servicios

Plant of 26,4 kWp installed via Slopped roof and roof with structures. Electricity generated annually: 67 MWh Installed panels: 81 CO2 reduced: 52 Tons/year

LEER MÁS »

Viña La Montaña

Plant of 130 kWp installed power on the ground. Electricity generated annually: 210 MWh Installed panels: 400 CO2 reduced: 126 Tons/year

LEER MÁS »

Viña Los Vascos

Plant of 113,4 kWp installed power on the Ground. Electricity generated annually: 170 MWh Installed panels: 378 CO2 reduced: 130 Tons/year

LEER MÁS »

Viña Los Nogales: Sur

Plant of 123,5 kWp installed power via Sloped rooftops and on the roof with structures. Electricity generated annually: 196 MWh Installed panels: 380 CO2 reduced:

LEER MÁS »
Close Menu